| Chaffee County’s Energy Efficiency and Conservation Strategy | 6 |
|
Strategies |
|
| The Vision of energynow can be achieved through a combination of strategies. An analysis of energy use, available resources and funding mechanisms produced a list of strategies that provide the best local opportunities to reduce energy consumption, minimize greenhouse gas emissions, reduce energy expenditures, support the local economy and sustain the local environment. | |
![]() |
|
|
Edison Electric Light Company of Salida built the first steam-powered electric generation plant in Salida in 1887. The coal-fired plant was 28 feet square with an attached boiler room and a 75-foot-tall smokestack. It began by supplying power for 750 electric light bulbs including, for the first time, street lights on F Street. The Edison Electric Light Company of Salida merged in 1905 with Salida Light Power and Utility Company, which had constructed a hydroelectric generating system on the South Arkansas River. |
|
|
|
|
| Previous Section | Next Section | Table of Contents |

